Monday, November 14, 2011

Day 2 of Framing: Finish the Flooring and Beginning the Outside Walls.

Here is a portion of the trusses that have been delivered. 

Look....we have walls!  This is from inside the house facing the garage.



This window will be in the utility room. 


This area is the master suite.  To the right is the breakfast nook.

The master suite again, with a door to the lanai.  The door to the far right leads to the breakfast nook. 

That will be the sliding door leading to the covered lanai.


This is the west side of the house.


No comments:

Post a Comment